[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"site-theme":3,"site-layout":4,"site-settings":5,"jsite-component-manifest-HeaderDefault":3,"jsite-component-manifest-FooterDefault":3,"site-components-en":23,"page-blog-en15194-en17128-certification-mid-drive-vs-hub-motor-en15194-en17128-certification-en-1":25,"component-SearchBar-en":42,"site-menu-en":43,"component-SocialLinks-en":234,"component-MenuList-1-en":235,"component-MenuList-2-en":244,"component-MenuList-3-en":253,"blog-sidebar-categories":264,"banner-Banner-blog-en":265,"blog-sidebar-related":271},null,{"layout":3},{"name":6,"owner":7,"creation":8,"modified":9,"modified_by":10,"pagestatus":11,"idx":11,"site_name":6,"site_url":12,"revalidate_token":13,"page_size":14,"site_name_in_page_titles":15,"theme":3,"layout":3,"logo":16,"logo_light":16,"favicon":3,"site_offline":11,"auto_translation":11,"default_language":3,"global_script_head":3,"global_script_body":3,"global_script_footer":3,"instance_id":3,"template_id":3,"template_repository":3,"pagetype":17,"languages":18,"company_name":19,"copyright":20,"mobile":21,"tel":21,"email":22},"ponebike","Administrator","2026-09-10 22:25:31.576630","2026-09-10 23:19:17.738087","jw2003",0,"https:\u002F\u002Fwww.ponebike.com","ponebike0820",12,"After","\u002Ffiles\u002F33\u002Fa2\u002Flogo-white.svg","Jsite Sites",[],"Ponebike Technology Co., Ltd.","All Rights Reserved.","+86 13924630945","info@ponebike.com",{"data":24},[],{"data":26},{"name":27,"owner":10,"creation":28,"modified":28,"modified_by":10,"pagestatus":11,"idx":11,"title":29,"slug":30,"category":31,"subtitle":32,"status":33,"author":3,"order":11,"is_featured":11,"image":34,"site":6,"language":3,"content":35,"meta_title":36,"meta_description":37,"pagetype":38,"attachments":39},"q8c8qjqmuf","2026-09-10 23:19:29.236788","EN 15194 & EN 17128: A Practical Certification Guide for Importers","en15194-en17128-certification","q5alvpscra","The two standards that decide whether your e-bikes can be sold and registered in Europe — scope, testing, documents and lead times.","Published","\u002Ffiles\u002F24\u002Fda\u002Fcertification-docs.png","\u003Cp>Every e-bike entering the European market must satisfy EN 15194 (EPACs) or EN 17128 (personal light electric vehicles). This guide explains the scope of each standard, the test report trail you should demand and the timeline to plan for.\u003C\u002Fp>\n\u003Ch3>Key Features\u003C\u002Fh3>\n\u003Cul>\u003Cli>\u003Cp>EN 15194 scope: pedal-assist to 25 km\u002Fh, 250W rated power, EMC and safety\u003C\u002Fp>\u003C\u002Fli>\u003Cli>\u003Cp>EN 17128: the framework for throttle and non-EPAC light electric vehicles\u003C\u002Fp>\u003C\u002Fli>\u003Cli>\u003Cp>What a compliant technical file contains: test reports, drawings, risk assessment\u003C\u002Fp>\u003C\u002Fli>\u003Cli>\u003Cp>Battery conformity: UN38.3 transport testing plus EN 50604 \u002F IEC 62133 where relevant\u003C\u002Fp>\u003C\u002Fli>\u003Cli>\u003Cp>Typical certification timeline: 6–8 weeks with a prepared factory, plan for it early\u003C\u002Fp>\u003C\u002Fli>\u003C\u002Ful>\n\u003Cp>Request a quote and our team will send you the full specification sheet, test reports and sample availability.\u003C\u002Fp>","EN 15194 and EN 17128 Certification Guide - PoneBike Blog","What EN 15194 and EN 17128 cover, how testing works, which documents importers need and how long certification takes.","Jsite Article",[40],{"file_name":41,"file_url":34},"certification-docs.png",{"data":3},{"menu":44},[45,53,106,146,176,206,214,221,229],{"id":46,"label":47,"slug":48,"href":48,"position":49,"order":50,"menu_type":51,"children":52},"q9tiqnloro","Home","\u002F","Header",1,"Page",[],{"id":54,"label":55,"slug":56,"href":57,"position":49,"order":58,"menu_type":59,"children":60},"q9utqf0vil","E-Bikes","products","\u002Fproducts",2,"Product Category",[61,70,79,88,97],{"id":62,"label":63,"href":64,"children":65},"products-city-commuters","City Commuters","\u002Fproducts\u002Fcity-commuters",[66],{"id":67,"label":68,"href":69},"products-step-through","Step-Through","\u002Fproducts\u002Fstep-through",{"id":71,"label":72,"href":73,"children":74},"products-cargo-family","Cargo & Family","\u002Fproducts\u002Fcargo-family",[75],{"id":76,"label":77,"href":78},"products-longtail-family","Longtail Family","\u002Fproducts\u002Flongtail-family",{"id":80,"label":81,"href":82,"children":83},"products-folding-portable","Folding & Portable","\u002Fproducts\u002Ffolding-portable",[84],{"id":85,"label":86,"href":87},"products-fat-tire-folding","Fat-Tire Folding","\u002Fproducts\u002Ffat-tire-folding",{"id":89,"label":90,"href":91,"children":92},"products-mountain-trail","Mountain & Trail","\u002Fproducts\u002Fmountain-trail",[93],{"id":94,"label":95,"href":96},"products-trail-series","Trail Series","\u002Fproducts\u002Ftrail-series",{"id":98,"label":99,"href":100,"children":101},"products-fleet-sharing","Fleet & Sharing","\u002Fproducts\u002Ffleet-sharing",[102],{"id":103,"label":104,"href":105},"products-share-ready","Share-Ready","\u002Fproducts\u002Fshare-ready",{"id":107,"label":108,"slug":109,"href":110,"position":49,"order":111,"menu_type":112,"children":113},"qabu51els9","Solutions","applications","\u002Fapplications",3,"Page Category",[114,120,126,132,139],{"id":115,"label":116,"slug":117,"href":118,"position":49,"order":50,"menu_type":112,"children":119},"qad6i2m2j9","Daily Commuting","daily-commuting","\u002Fapplications\u002Fdaily-commuting",[],{"id":121,"label":122,"slug":123,"href":124,"position":49,"order":58,"menu_type":112,"children":125},"qaesh9nv49","Family & Cargo","family-cargo","\u002Fapplications\u002Ffamily-cargo",[],{"id":127,"label":128,"slug":129,"href":130,"position":49,"order":111,"menu_type":112,"children":131},"qagsk9t4s4","Last-Mile Delivery","last-mile-delivery","\u002Fapplications\u002Flast-mile-delivery",[],{"id":133,"label":134,"slug":135,"href":136,"position":49,"order":137,"menu_type":112,"children":138},"qahqi1g5os","Tourism & Rental","tourism-rental","\u002Fapplications\u002Ftourism-rental",4,[],{"id":140,"label":141,"slug":142,"href":143,"position":49,"order":144,"menu_type":112,"children":145},"qai2h8etbj","Sharing & Micromobility","sharing-micromobility","\u002Fapplications\u002Fsharing-micromobility",5,[],{"id":147,"label":148,"slug":149,"href":150,"position":49,"order":137,"menu_type":112,"children":151},"qajvl9lagi","OEM & ODM","oem-odm","\u002Foem-odm",[152,158,164,170],{"id":153,"label":154,"slug":155,"href":156,"position":49,"order":50,"menu_type":51,"children":157},"qakq51r9do","Private Label","private-label","\u002Foem-odm\u002Fprivate-label",[],{"id":159,"label":160,"slug":161,"href":162,"position":49,"order":58,"menu_type":51,"children":163},"qamg8q61h6","Custom Engineering","custom-engineering","\u002Foem-odm\u002Fcustom-engineering",[],{"id":165,"label":166,"slug":167,"href":168,"position":49,"order":111,"menu_type":51,"children":169},"qan4vtsg9m","Prototyping & Samples","prototyping-sample","\u002Foem-odm\u002Fprototyping-sample",[],{"id":171,"label":172,"slug":173,"href":174,"position":49,"order":137,"menu_type":51,"children":175},"qaobivv1gr","Factory Audit","factory-audit","\u002Foem-odm\u002Ffactory-audit",[],{"id":177,"label":178,"slug":179,"href":180,"position":49,"order":144,"menu_type":112,"children":181},"qapthnbhfn","Factory & Quality","factory","\u002Ffactory",[182,188,194,200],{"id":183,"label":184,"slug":185,"href":186,"position":49,"order":50,"menu_type":112,"children":187},"qaqqsnf50p","Frame Fabrication","frame-fabrication","\u002Ffactory\u002Fframe-fabrication",[],{"id":189,"label":190,"slug":191,"href":192,"position":49,"order":58,"menu_type":112,"children":193},"qar4279llj","Motor & Battery Integration","motor-battery-integration","\u002Ffactory\u002Fmotor-battery-integration",[],{"id":195,"label":196,"slug":197,"href":198,"position":49,"order":111,"menu_type":112,"children":199},"qaso0a0dsi","Testing Lab","testing-lab","\u002Ffactory\u002Ftesting-lab",[],{"id":201,"label":202,"slug":203,"href":204,"position":49,"order":137,"menu_type":112,"children":205},"qatpkt6vqd","Quality & Certifications","quality-certifications","\u002Ffactory\u002Fquality-certifications",[],{"id":207,"label":208,"slug":209,"href":210,"position":49,"order":211,"menu_type":212,"children":213},"qav9baq49q","Blog","blog","\u002Fblog",6,"Article Category",[],{"id":215,"label":216,"slug":217,"href":218,"position":49,"order":219,"menu_type":51,"children":220},"qb01ckj3gj","Contact","contact","\u002Fcontact",7,[],{"id":222,"label":223,"slug":224,"href":225,"position":226,"order":227,"menu_type":51,"children":228},"qb1p8lnbnd","About PoneBike","about","\u002Fabout","Hidden",99,[],{"id":230,"label":231,"slug":6,"href":232,"position":226,"order":227,"menu_type":51,"children":233},"qb2thmq176","PoneBike","\u002Fponebike",[],{"data":3},{"data":236},{"content":237},{"title":55,"items":238},[239,240,241,242,243],{"item_title":63,"item_link":64},{"item_title":72,"item_link":73},{"item_title":81,"item_link":82},{"item_title":90,"item_link":91},{"item_title":99,"item_link":100},{"data":245},{"content":246},{"title":108,"items":247},[248,249,250,251,252],{"item_title":116,"item_link":118},{"item_title":122,"item_link":124},{"item_title":128,"item_link":130},{"item_title":134,"item_link":136},{"item_title":141,"item_link":143},{"data":254},{"content":255},{"title":256,"items":257},"Company",[258,260,261,262,263],{"item_title":259,"item_link":225},"About Us",{"item_title":178,"item_link":180},{"item_title":148,"item_link":150},{"item_title":208,"item_link":210},{"item_title":216,"item_link":218},{"data":3},{"data":266},{"content":267},{"title":268,"description":269,"image":270},"Knowledge Hub","Market insights, certification guides and sourcing playbooks for e-bike importers.","\u002Ffiles\u002F1f\u002F23\u002Fbattery-guide.png",{"data":272},[273,280,287],{"name":274,"owner":10,"creation":275,"modified":275,"modified_by":10,"title":276,"slug":277,"category":31,"subtitle":278,"status":33,"author":3,"order":11,"is_featured":11,"image":279,"site":6,"language":3},"q8ebouc10g","2026-09-10 23:19:29.448507","Sourcing E-Bikes from China: MOQ, Lead Times and a 12-Point QC Checklist","ebike-sourcing-china-checklist","How to structure your first container order — supplier screening, sample process, inspection points and shipment documentation.","\u002Ffiles\u002F7d\u002Ff5\u002Fsourcing-port.png",{"name":281,"owner":10,"creation":282,"modified":282,"modified_by":10,"title":283,"slug":284,"category":31,"subtitle":285,"status":33,"author":3,"order":11,"is_featured":11,"image":286,"site":6,"language":3},"q8dnmr059l","2026-09-10 23:19:29.342291","Mid-Drive vs Hub Motor: Choosing the Right Drive for Your Market","mid-drive-vs-hub-motor","Torque feel, maintenance, price points and after-sales: a straight comparison to help brand owners pick a platform.","\u002Ffiles\u002F4a\u002F12\u002Fmotor-assembly.png",{"name":27,"owner":10,"creation":28,"modified":28,"modified_by":10,"title":29,"slug":30,"category":31,"subtitle":32,"status":33,"author":3,"order":11,"is_featured":11,"image":34,"site":6,"language":3}]